Complete Demolition of the Bathroom

Complete Demolition of the Bathroom

The 2nd story demolition moves from the roof onto the interior, starting with the #bathroom. The room will be completely gutted, with nearly every portion of the space demolished. The shower and tub will be removed as well as the toilet and surrounding water closet. Once that's done all of the tile will be broken up and hauled away leaving the floors completely bare. The only thing that will be left intact is the sink and countertop. br br Get more info on Master Demolition Inc.


User: Master Demolition Inc.

Views: 9

Uploaded: 2016-08-19

Duration: 00:10