EVENING 5: Boustead to build one less ship at higher cost

EVENING 5: Boustead to build one less ship at higher cost

In today’s edition of Evening 5 — Boustead group is building five littoral combat ships, instead of six, at a higher contract cost of RM11.2 billion. Meanwhile, the MACC looks into allegations of corruption involving Petronas and an international oil and gas company.


User: The Edge TV

Views: 243

Uploaded: 2023-05-26

Duration: 06:23

Your Page Title