Kashmir Train Inauguration Nears: High Speed Trial Run Conducted On Katra-Banihal Stretch Of USBRL

Kashmir Train Inauguration Nears: High Speed Trial Run Conducted On Katra-Banihal Stretch Of USBRL

The high-speed trial was conducted by the Railways on the Katra to Banihal stretch of Udhampur-Srinagar-Baramulla-Rail-Link (USBRL), reports Amir Tantray.


User: ETVBHARAT

Views: 4

Uploaded: 2025-01-08

Duration: 02:15

Your Page Title