A short ride and walk through the king street watermain/TTC track construction areas shows progress

A short ride and walk through the king street watermain/TTC track construction areas shows progress

Video is double speed with original audio intact.br If you were wondering, no, I will never ride on the sidewalk. I walked it like anyone should upon reaching the fenced off area.br br Can't wait for the construction to be completed. Though, the lack of noise from vehicles made this area so much quieter, I almost wanted to stop and stay for an hour, but had to return home.


User: The Root Aka Rootbrian

Views: 11

Uploaded: 2025-08-12

Duration: 02:34

Your Page Title