A key flood defence in Highbridge could soon be upgraded

A key flood defence in Highbridge could soon be upgraded

Other options on the table include building a new floodplain water storage facility and strengthening existing riverbanks. Long-term plans look further upstream — with improvements to the Glastonbury Millstream and a possible redirection of water into the South Drain.


User: Local TV

Views: 17

Uploaded: 2025-09-23

Duration: 01:45